Fort Tryon Park

Fort Tryon Park Zone 5

Bway Sidewalk And Adjacent Path From Bennett Av To E-W Path Near Sherman Av
Last 10 Inspections
Overall Condition AcceptableCleanliness Acceptable
9 of 109 of 10
Inspection DateOverall ConditionCleanlinessUnacceptable Features
10/30/2025AcceptableAcceptable
    6/18/2025AcceptableAcceptable
    • Benches
    12/18/2024AcceptableAcceptable
      8/6/2024AcceptableAcceptable
        3/6/2024AcceptableAcceptable
          10/31/2023AcceptableAcceptable
            6/27/2023AcceptableAcceptable
              2/2/2023UnacceptableUnacceptable
              • Litter
              • Paved Surface
              9/23/2022AcceptableAcceptable
                5/10/2022AcceptableAcceptable
                • Paved Surface
                • Weeds